Our partners are also building: At EnergieWerk Ilg in Dornbirn, an intermediate building was realized and walls, floor and ceiling slabs, an exposed concrete front and an interior precast staircase made of climate-controlled concrete.
Concrete parts >
Concrete quantity >
CO2 saved >
Partner >
Concrete parts >
Floor
Ceilings
Stairs
Concrete quantity >
80m3
CO2 saved >
CO2 captured by Clim@Add® - 5.3 t
amount of CO2 saved through cement reduction - 1 t
Partner >
KOPF Kies + Beton GmbH from Altach
EnergieWerk Ilg from Dornbirn
Technical Experimental Station at the HTL Rankweil