ÖBB technical building, Bregenz
The technical building of ÖBB-Infrastruktur AG in Bregenz. A successful pilot and the starting signal for a long-term cooperation for the infrastructure around the Austrian rail network.
Concrete parts >
Concrete quantity >
CO2 saved >
Partner >
Concrete parts >
- Floor
- Ceilings and walls
Concrete quantity >
110m3
CO2 saved >
- CO2 captured by Clim@Add® - 7.2 t
- amount of CO2 saved due to cement reduction - 1.4 t
Partner >
- KOPF Kies + Beton GmbH from Altach
- EnergieWerk Ilg from Dornbirn
- Technical Experimental Station at the HTL Rankweil
CarStorCon® Technologies
Previous
Next